08-13-19 Streets Project Updates

Delta 3 Engineering Progress Report

Proposed 2019 Infrastructure Improvements’ Project (Level Street, South Street, and North Street):

Completed the week of August 5, 2019

  1. Owen’s Excavating providing landscaping behind concrete curb and gutter on Level Street, South Street, and North Street.

Anticipated schedule for the week of August 12, 2019

  1. Owen’s Excavating to mobilize equipment, etc. to the other part of the Project (Farwell Street, N. Weaver Street, and S. Weaver Street) on Monday.
  2. Re-install mailboxes on Level Street, South Street, and North Street.
  3. Owen’s Excavating to provide traffic control and erosion control on the Farwell/Weaver portion of the Project on Monday.
  4. Owen’s Excavating to begin sanitary sewer installation on Farwell street on Tuesday.